3.14.2009
The Last Saturday
3.04.2009
Stem Plates
The plate has to be carefully pegged into place. I finally hit a snag here when one of the pegs came out the side of the gunwale. It broke the stem plate and a piece out of the gunwale. At first I was really upset, as I was running out of scraps of cedar that were deep enough to fill the area that I had cut out for the stem plates. But then I remembered how well I had done at pegging the deck beams into place. Many people had problems with that step when I didn't.
So what I have left to do is:
- Place and lash the chines
- Fit & peg the Masik
- Need one more curved deck beam between masik and footrest
- Deck stringers cut, pegged and shaped forward and aft of the cockpit
- Seal the wood frame
- Stretch the nylon
- Sew it onto the kayak
- Add cockpit coaming
- Stain the skin
- Seal the skin
Wow! That's alot to do yet. Wish me luck.
2.22.2009
Maiden Voyage
Seems to take forever
In this picture you can see the added piece and the lashing on the first rib in the right corner.
A different view, you can see the pegs that I sawed off flush with the gunwales.
I put the qajaq on the floor to test fit it. It fits!! Now I'm working on fitting the masik, the large piece of wood you see here.
The masik holds you in place and gives you a lot of support. It is placed just behind your knees and as low as you can make it and still get into the qajaq. The masik is curved so it can be a little tricky. I have Pete to thank for finding enough curved branches for the whole class!
Ken's qajaq is on the left & you can see he has his chines in place on either side of the keelson. This is my next step. Then the masik, another piece to go over each stem, 2 more curved deck beam still needed...see why I'm worried?
2.10.2009
I have ribs
2.03.2009
Back to work
Meanwhile Danielle was back and working on steam bending her ribs. Here she is sighting down her qajaq to see if they line up nicely. You can see the ones she has laid out to go next into the steamer.
Here is the steam box we have set up and the high tech device we use to bend the ribs.
Ken was next and managed to get all his ribs on too. Next weekend will be my turn, so I kept an eye on these two.
1.30.2009
XC Ski Break
So I invited myself up to my friend Sharon's place for the weekend. She is into xc skiing and had been inviting me for a while, so no, I'm not that pushy.
We actually had quite a group for the weekend at their hunting lodge called Nawaka. We had 10 people for the weekend. I didn't know they had snowmobiles, so I got my first real ride and it was a blast.
Saturday morning Sharon, Patty, Amiee, her new friend Jamie and I went just south of Mio to go cross country skiing. It was a lot of fun and I fell up and down every hill on our first loop. This was only my third outing on my new skis and of course the lesson wasn't until Sunday morning.
I got up early sunday and drove the hour and fifteen minutes to Roscommon for my lesson. This is a shot of the 3 mile long driveway out of Nawakwa.
I met 24 other Solorites on a very cold 10 below morning for our class. I finally learned how to get up after falling, coulda used that the day before!
I drove back to Nawakwa where we had another fun packed snowmobile ride and a nice relaxing evening in front of the fire. Sorry, no photos of the gathering by the fire, too tired to remember.
I drove home Monday just in time to get some more work done on the qajaq.
